Project archive

Real builds, with the proof attached.

Explore automations, apps, and internal tools by platform or business need. Each project includes its available evidence and current state. Confidential client work stays anonymous.

41 projects shown

2026

13 records
  • n8n
Prototype

A follow-up desk for commercial cleaners. Enquiries, quotes, and reviewed message drafts stay together, with a clear next action for each conversation.

3 screenshots

Web applicationPrototype

A community-powered, vehicle-specific flood observation app for the Philippines that presents recent evidence without making safety guarantees.

1 screenshot + Local proof film

Open full-size image
  • n8n
Prototype

A reusable n8n error workflow that sanitizes failure details, alerts the owner in Google Chat, and records whether the alert was delivered.

1 screenshot + Local proof film

  • n8n
Prototype

An n8n workflow that receives RFP attachments, validates the intake, reads only approved evidence, builds a cited draft, and stops for human review.

2 screenshots + Local proof film

  • n8n
Prototype

A scheduled n8n workflow that scores customer-health signals with explainable rules and prepares high-risk accounts for human review.

2 screenshots + Local proof film

Web applicationPrototype

A browser-based franchise operations demo for opening checks, blockers, and handoffs using synthetic local data.

1 screenshot + Local proof film

Open full-size image
Web applicationPrototype

An offline-first review desk for revenue exceptions with fail-closed connectors and synthetic fixtures.

1 screenshot + Local proof film

Open full-size image
Web applicationBuilt

A focused operating desk that turns recovery signals into one explainable next move and keeps a local outcome history.

1 screenshot + Local proof film

Open full-size image
macOS applicationBuilt

Private voice typing for the way you think. A native Mac app with on-device dictation, a personal dictionary, and reusable spoken snippets.

4 screenshots

  • n8n
Built

A post-call n8n workflow that turns approved call notes into a proposal draft and keeps the lead record current.

1 screenshot + Local proof film

Internal systemPrototype

An internal prototype that moves delivery evidence through extraction, review, approval, and invoice-export gates.

1 screenshot + Local proof film

Open full-size image
GameBuilt

A small isometric farming game with a deterministic plant, water, harvest, and sale loop.

1 screenshot + Local proof film

Open full-size image
  • n8n
Built

A human-directed lead operations system that gathers opportunities, prepares the work, and keeps outbound approval with the operator.

1 screenshot + Local proof film

Undated archive records

28 records
  • GoHighLevel
Built

A cropped checkout-trigger configuration excerpt with product and funnel values obscured.

1 screenshot + Local proof film

Web applicationPrototype

An offer-builder interface demonstration. The recording explicitly shows demo mode with OpenAI not connected.

1 screenshot + Local proof film

  • GoHighLevel
Built

A GoHighLevel suite of 13 draft workflows covering quotation follow-up, reply routing, booking updates, invoicing, and email nurturing.

6 screenshots

  • GoHighLevel
Built

A short opt-in page preview showing the finished layout and form.

1 screenshot + Local proof film

  • GoHighLevel
Built

A brief action-chain excerpt showing comment responses, tags, lead-source updates, and messenger routing.

1 screenshot + Local proof film

  • GoHighLevel
Built

A connected GoHighLevel system for lead intake, qualification, booking reminders, missed calls, and no-show recovery.

6 screenshots + Local proof film + Loom walkthrough

  • n8n
Built

An n8n recovery workflow that checks cart, order, consent, and timing state before preparing follow-up.

1 screenshot + Local proof film

Open full-size image
  • n8n
Built

An n8n workflow that searches for roles, checks the results, adapts a resume copy, and prepares a draft application package.

1 screenshot + Local proof film

  • n8n
Built

An n8n content workflow that generates a platform-ready post from a scheduled prompt and connected context.

1 screenshot + Local proof film

  • Make
Built

A Make scenario that turns completed project work into a controlled accounting and operations handoff.

1 screenshot + Local proof film

Open full-size image
  • n8n
Prototype

A webhook-backed n8n chat flow that answers from a controlled document source and returns the response through one visible path.

1 screenshot + Local proof film

Open full-size image
Web applicationPrototype

A web prototype that turns spreadsheet-shaped surveys into a mobile interview and structured response-review flow.

1 screenshot + Local proof film

Open full-size image
  • n8n
Built

An anonymized n8n workflow that prepares call transcripts for storage, trend review, and a human-readable insights layer.

1 screenshot + Local proof film

Open full-size image
  • Zapier
Built

A Zapier workflow that turns one source file into channel-specific drafts routed through separate paths.

1 screenshot + Local proof film

Open full-size image
  • Make
Built

A Make scenario that records webhook events, updates an operations sheet, and routes the correct team notification.

1 screenshot + Local proof film

Open full-size image

Privacy-protected record

No client image, data, or identifying system detail is published for this engagement.

Client systemDelivered

An anonymous healthcare operations engagement focused on organizing call handling and internal handoffs. Details are intentionally withheld.

Anonymous text-only record

Privacy-protected record

No client image, data, or identifying system detail is published for this engagement.

Client systemDelivered

An anonymous healthcare operations engagement focused on preparing revenue work for human review. Details are intentionally withheld.

Anonymous text-only record

  • Zapier
Built

A Zapier workflow that enriches a webhook lead, separates priority paths, and prepares the appropriate follow-up.

1 screenshot + Local proof film

Open full-size image
  • n8n
Built

An n8n prospecting workflow that cleans search results, records the lead, prepares a first email, and sends an internal run summary.

1 screenshot + Local proof film

Open full-size image
Web applicationPrototype

A responsive product-landing concept used to explore interactive presentation and 3D composition.

1 screenshot + Local proof film

Open full-size image
  • Zapier
Built

A Zapier workflow that reacts to an Asana status change and routes each project stage to the correct folder, subtask, or email action.

1 screenshot + Local proof film

Open full-size image
  • n8n
Built

An n8n workflow that discovers public business pages, extracts contact details, filters unwanted domains, and stores structured results.

1 screenshot + Local proof film

Open full-size image
  • n8n
Built

An n8n content workflow that separates keyword research, source gathering, drafting, and editorial review.

1 screenshot + Local proof film

Open full-size image
GameBuilt

A browser-based trick-run game with a physics-led play loop and a Blender-to-browser asset pipeline.

1 screenshot + Local proof film

Open full-size image
  • n8n
Built

An inbound-email workflow that matches a message to customer context before preparing the appropriate next step.

1 screenshot + Local proof film

Web applicationDeployed

An approval-first application desk that keeps intake, review, follow-up, and the next decision in one web application.

1 screenshot + Local proof film

  • n8n
Built

A scheduled n8n workflow that prepares a video, checks generation status, converts the result, and hands it to YouTube publishing.

1 screenshot + Local proof film

Open full-size image
AI Automation Projects and Case Studies | Armageddon Vivas